Electrical Load Bank Planning: Best Practices for Cx Testing

The use of load banks, portable or permanent, during the commissioning process to simulate encountered electrical loads has many facets.  Loads banks provide electrical loading (kW) as well as mechanical loading (BTU’s).  

Utilization of load banks, their placement and loading, can be a complicated task.  Careful consideration must be given to how, how much and when the loading should be engaged.