In our last post, Whole Building Air Leakage Testing, we discussed the importance of designing a continuous air barrier. While proper design and installation are critical to passing the Air Leakage test, the work that goes into performing the actual test should not be overlooked. With this in mind, we want to reiterate the importance of thinking through the testing process early in project design.
If testing is required per your authority having jurisdiction or energy code compliance path, it often must be conducted in order to receive a Certificate of Occupancy. This means that the test must be completed and documented before tenants and owners can move into the building, creating a greater sense of urgency and need for adhering to the test schedule.
Planning early will set the team on the right path. As the test date approaches, your building enclosure consultant will discuss more details and logistics with the project team.
The air leakage test requires a significant amount of preparation, from multiple project team parties. With this in mind, we’ve created a pre-test memo outlining the test-day plan and prep to be completed prior to the test. Prep often includes:
The pre-test memo is distributed early so that the team can properly schedule the necessary prep and labor time. We also conduct pre-test meetings to ensure that each party knows their responsibilities, to answer any questions and to identify if extra efforts may be needed.
You’ve planned and prepped - What happens on test day?
The testing team will be on site early the morning of the test to review the prep work and ensure the building is ready to test. After prep has been confirmed, the team will begin setting up large door fans at the specified locations and running tubing throughout the building.
A few important things to remember for the test day include:
The test is conducted at a number of specified pressurization and depressurization values, in accordance with applicable codes, standards and project specifications.
Sometimes test plans can be derailed due to unforeseen factors – this is where an experienced team can bring real value to the test! Vacating the building a second time to repeat the test is the last thing anyone wants when crews are working to obtain a certificate of occupancy.
Our Building Science team has been conducting air leakage tests nationwide for over 10 years, on all building types, from single-story commercial offices to 40-story apartment buildings. This experience helps tremendously with on-the-spot trouble-shooting and creative solutions when a test seems to be “going sideways”.
Whole Building Air Leakage Testing requires good planning and careful execution. With a prepared and experienced team, your test can run smoothly, efficiently and successfully.